title: The 8 Wastes of Lean in a CNC Shop, With Examples
description: "The 8 wastes of lean (DOWNTIME) in a CNC shop: 7 vs 8 wastes, the 8th waste, muda, mura and muri, and a CNC example for each type of waste."
image: https://www.jitbase.com/hubfs/8-wastes-of-lean-cnc-shop.webp
---

[![JITbase](https://www.jitbase.com/hs-fs/hubfs/Logos/jitbase-logo-black-horiz.webp?width=112&height=36&name=jitbase-logo-black-horiz.webp)](https://www.jitbase.com/)

- Solutions 
    - [Production Planning Plan and organize your shop floor](https://www.jitbase.com/production-planning)
    - [Machine Monitoring Understand machine performance](https://www.jitbase.com/machine-monitoring)
    - ---
      
      [Edge Platform For software providers & industrial IT/OT teams](https://www.jitbase.com/edge-platform)
- Resources 
    - [Downloads](https://www.jitbase.com/download)
    - [Blog](https://www.jitbase.com/blog)
- [Pricing](https://www.jitbase.com/pricing)
- [About Us](https://www.jitbase.com/about-us)

[Log in](https://app.jitbase.com/) [Book a demo](https://www.jitbase.com/demo) [Get started free](https://sso.jitbase.com/realms/webapp/protocol/openid-connect/registrations?client_id=website-registration&response_type=code&scope=openid&redirect_uri=https%3A%2F%2Fadmin.jitbase.com)

EN

- [English](https://www.jitbase.com/blog/8-wastes-of-lean-cnc-shop)
- [Français](https://www.jitbase.com/fr/blog/muda-7-gaspillages-lean-atelier-cnc)

Menu

[← All articles](https://www.jitbase.com/blog)

# The 8 Wastes of Lean in a CNC Shop, With Examples

Nov 27, 2026 By [Judicael Deguenon](https://www.jitbase.com/blog/author/judicael-deguenon)

[Machine monitoring](https://www.jitbase.com/blog/tag/machine-monitoring)

![Production manager reviewing a chart of machine stop reasons on a tablet next to a 5-axis CNC machining center: 8 wastes of lean with JITbase](https://www.jitbase.com/hubfs/8-wastes-of-lean-cnc-shop.webp)

The 8 wastes of lean are the activities that use time, people, machines or material without adding value for the customer. They are defects, overproduction, waiting, non-utilized talent, transportation, inventory, motion and extra-processing. In a CNC shop, they hide in plain sight: a machine waiting for a program, a setup slowed by a missing tool, parts made ahead of the order.

This guide explains where the 7 and 8 wastes come from, what the 8th waste is, and how muda relates to mura and muri. It then gives one CNC example for each type of waste. It also shows which wastes machine data can reveal and which ones you only see on the floor, and ends with a simple way to start. To prepare the floor visit, see [the gemba walk in a CNC shop](https://www.jitbase.com/blog/gemba-walk-cnc-shops).

## What Are the 8 Wastes of Lean?

In lean manufacturing, waste is called muda, a Japanese word that means uselessness. The Lean Enterprise Institute defines it as any activity that uses resources without creating value for the customer (see its [definition of muda](https://www.lean.org/lexicon-terms/muda/)). The customer pays for a part that meets the drawing, delivered on time. Everything else is cost.

Taiichi Ohno, one of the founders of the Toyota Production System, grouped these losses into 7 types. An 8th was added later. Their first letters spell DOWNTIME:

1. **Defects:** parts scrapped, reworked or sorted.
2. **Overproduction:** making more parts, or making them earlier, than the customer needs.
3. **Waiting:** people or machines waiting for material, information, a decision or another step.
4. **Non-utilized talent:** skills and ideas of people that are not used.
5. **Transportation:** moving parts, material or tools more than needed.
6. **Inventory:** raw material, work in process or finished parts beyond what the flow needs.
7. **Motion:** movements of people that add no value, such as walking or searching.
8. **Extra-processing:** doing more work than the customer asks for.

Not every activity without value can be removed tomorrow. A setup adds no value to the part, but you cannot run a new job without it. Lean calls this type 1 muda, or necessary waste: you reduce it over time, for example with shorter changeovers. Type 2 muda is pure waste, such as waiting for a program that should have been ready, and can often be removed quickly.

### The 7 Wastes vs the 8 Wastes of Lean

The original 7 wastes of lean are often remembered as TIMWOOD: transportation, inventory, motion, waiting, overproduction, over-processing and defects. The 8 wastes add non-utilized talent and become DOWNTIME. Over-processing is usually renamed extra-processing, but it is the same waste.

|  | 7 wastes of lean | 8 wastes of lean |
| --- | --- | --- |
| **Acronym** | TIMWOOD | DOWNTIME |
| **Wastes in the list** | Transportation, inventory, motion, waiting, overproduction, over-processing, defects | The same 7 (over-processing becomes extra-processing), plus non-utilized talent |
| **Origin** | Toyota Production System (Taiichi Ohno) | Added when lean spread outside Toyota |

The two lists do not compete. Many shops today use the 8 wastes, because the people who run the machines are often the best source of ideas to remove the other seven.

### What Is the 8th Waste in Lean?

The 8th waste in lean is non-utilized talent. It covers the skills people have but do not use, the training they never received, and the ideas nobody asks for. It was not part of Ohno's list. It was added when lean spread outside Toyota, to make explicit what Toyota already practiced: improvement comes from the people who do the work.

In a CNC shop, it is often the most expensive waste, because it feeds the others. A setup that waits for the one person who knows the machine is waiting. A machinist who knows why the job scraps three parts per batch, but is never asked, leaves the defects in place.

### Muda, Mura and Muri

Lean names three types of loss, often called the 3 Ms:

- **Muda (waste):** the 8 wastes described in this guide.
- **Mura (unevenness):** a load that changes a lot from one day or one week to the next.
- **Muri (overburden):** asking too much of a person or a machine.

The three are linked. An uneven load creates peaks where operators run too many machines and setups are rushed. Those peaks create waste: scrap, overtime, then machines waiting in the valleys. Removing muda without leveling the load often brings the same problems back. See [heijunka and production leveling in CNC shops](https://www.jitbase.com/blog/heijunka-production-leveling-cnc-shop).

## The 8 Wastes in a CNC Shop: Overview

The table gives one typical example of each waste in a CNC shop, how to spot it, and where the information comes from. The last column matters: some wastes appear in machine and operator data, others only on the floor.

| Waste | CNC shop example | How to spot it | Where the information comes from |
| --- | --- | --- | --- |
| **Defects** | Scrapped parts, rework, first parts out of tolerance | Non-conforming parts by machine and by job, first pass yield | Operator declaration at the machine, with a reason |
| **Overproduction** | Running 500 parts for an order of 200 because the setup is done | Parts made beyond the order quantity, jobs finished long before their due date | Part count compared with the order, finished goods inventory |
| **Waiting** | Machine stopped for material, a program, an operator or a first-article approval | Stop time by reason | Machine status and stop reasons entered by the operator |
| **Non-utilized talent** | Only one person can set up the 5-axis machine | Stops for “waiting for an operator”, skills held by a single person | Skills matrix, stop reasons, talking with operators |
| **Transportation** | Parts sent to another building for deburring, then brought back | Distance traveled by a job from saw to shipping | Floor observation, routing |
| **Inventory** | Carts of parts waiting between turning and milling | Jobs waiting between operations, lead time much longer than machine time | Work in process count, floor observation |
| **Motion** | Walking to the tool crib or searching for a holder during a setup | Setups longer than the standard | Floor observation, actual vs standard setup time |
| **Extra-processing** | Tolerances tighter than the drawing, 100% inspection where it is not required | Operations or checks that the customer did not ask for | Drawing and routing review, actual cycle times |

## The 8 Types of Waste in Lean, With CNC Examples

### 1. Defects

A defective part costs the material, the machine time and the operator time already spent on it. Then come the costs of sorting, rework, a new setup if the batch must be rerun, and sometimes a late delivery. In a CNC shop, typical causes are tool wear, an offset entered wrong, a fixture that moves, an unclear drawing or a program change that was not validated.

To see it, count non-conforming parts by machine, by job and by reason, and follow the share of good parts made the first time. Then work on the reasons that come back most often. See [first pass yield in CNC shops](https://www.jitbase.com/blog/first-pass-yield-fpy-cnc-shops) and [how to reduce the scrap rate in CNC machining](https://www.jitbase.com/blog/reducing-scrap-rate-cnc-machining).

### 2. Overproduction

Overproduction means making parts before they are needed, or more than needed. Ohno called it the worst waste, because it creates the others. It leads to inventory to store, parts to move and count, and defects found late, once the whole batch is made. It also uses machine hours that another job was waiting for.

In a CNC shop, it often comes from a good intention: “the setup is done, let’s run a few hundred more.” For a repeat part with steady demand, that can be the right choice. It should be a decision based on the setup cost and the real demand, not a habit. See [lot sizing in CNC shops](https://www.jitbase.com/blog/lot-sizing-cnc-shops).

### 3. Waiting

Waiting is the easiest waste to measure in a CNC shop, because the machine is stopped. It waits for material, a program, a tool, an operator, a first-article approval or a decision. The operator can wait too, in front of a long cycle with nothing else to do.

The key is to know why the machine is waiting, not only that it is stopped. When the operator enters a stop reason at the machine, the stop time can be added up by reason over a week. A Pareto chart then shows the two or three reasons worth working on first. See [root cause analysis of downtime with Pareto charts](https://www.jitbase.com/blog/downtime-root-cause-analysis-pareto-charts). To shorten the wait for help when a problem happens, see [the andon system in CNC shops](https://www.jitbase.com/blog/andon-system-cnc-shops).

![Operator screen next to a CNC machine where stop reasons and non-conforming parts are entered: 8 wastes of lean with JITbase](https://www.jitbase.com/hubfs/JITbase%20on-machine%20display.png)

**See why your machines are waiting.** JITbase records the status of each machine, and operators enter the stop reason at the machine, so you can see where the waiting time goes.

[See machine monitoring](https://www.jitbase.com/machine-monitoring)

### 4. Non-Utilized Talent

This waste shows up in several ways in a CNC shop:

- Only one person can set up a key machine, so the setup waits when that person is busy or absent.
- An experienced machinist spends the shift loading parts on a long cycle.
- Operators know why a job always runs late, but nobody asks them.
- A new hire learns on the job, with no plan and no follow-up.

A skills matrix shows who can do what on each machine, and which skills depend on one person. Training a second person on critical setups reduces the waiting that follows. See [the skills matrix for CNC shops](https://www.jitbase.com/blog/skills-matrix-cnc-shops).

### 5. Transportation

Transportation is moving parts, material or tools more than needed. In a CNC shop, picture a job that goes from the saw to the lathe, then to deburring in another bay. It then crosses the shop to the machining center, and ends in an inspection room far from both. Each move takes time, needs a person or a forklift, and adds a risk of damage or lost parts.

Machine data does not show it. Follow the routing of a typical job and draw its path on a floor plan: this is often called a spaghetti diagram. Machine layout, the order of operations and the location of inspection are the usual levers. See [manufacturing routing for CNC shops](https://www.jitbase.com/blog/manufacturing-routing-cnc-shop).

### 6. Inventory

Inventory is everything waiting: bar stock bought too early, carts of parts between operations, finished parts waiting for an order. It ties up cash and floor space. It also hides problems: when a batch waits two days between turning and milling, a defect made on the lathe is found two days later, on every part.

A simple sign is the gap between lead time and machine time. If a job needs 6 hours of machine time but spends 3 weeks in the shop, most of that time is waiting in a pile. See [the guide to shop-floor management and WIP tracking](https://www.jitbase.com/blog/shop-floor-management-wip-production-monitoring).

### 7. Motion

Motion is the movement of people that adds no value. Think of walking to the tool crib, searching for a holder, a gauge or the right program version, or bending to load a heavy part. In a CNC shop, much of it happens during setups. It shows up as setups that take longer than the standard, with large differences from one person to the next.

The fix is often simple: tools, fixtures and gauges ready before the machine stops, kits prepared for repeat jobs, the program available at the machine. See [how to reduce changeover time](https://www.jitbase.com/blog/reducing-changeover-time-manufacturing) and [hidden time in operator tasks](https://www.jitbase.com/blog/hidden-time-operator-tasks-cnc-shops).

### 8. Extra-Processing

Extra-processing is doing more than the customer asks for. In a CNC shop, it means holding a tolerance tighter than the drawing or adding a finishing pass that changes nothing. It also means deburring edges the drawing does not mention, or checking every part when a sampling plan would do. Inspection that is heavier than needed also adds waiting, because the machine stops until the part is approved.

Compare the drawing, the routing and what is really done at the machine. Ask the operator what they do “just in case”. For the first part of a job, see [first article inspection in CNC shops](https://www.jitbase.com/blog/first-article-inspection-cnc-shops).

## Example: One Week on a 5-Axis Machining Center

Take a 5-axis machining center running two 8-hour shifts, 5 days a week, so 80 hours. The machine status gives the time in cycle, in setup and stopped. The stop reasons and non-conforming parts are entered by the operator at the machine. Here is the week, with the waste behind each line:

| Machine time | Hours | Waste behind it |
| --- | --- | --- |
| **In cycle** | 46 h | Mostly value-adding, except the cycle time spent on the 14 non-conforming parts (about 1.4 h): defects |
| **Setup within standard** | 8 h | Necessary today, to reduce over time |
| **Setup above standard** | 4 h | Look on the floor: motion (searching for tools, fixtures, gauges) or a missing standard |
| **Waiting for an operator** | 6 h | Waiting, often linked to non-utilized talent when only one person can set up the machine |
| **Waiting for material** | 5 h | Waiting |
| **Waiting for first-article approval** | 4 h | Waiting, and sometimes extra-processing if the inspection is heavier than needed |
| **Waiting for a program** | 3 h | Waiting |
| **Breakdown** | 2 h | Waiting for repair: a maintenance problem more than a flow problem |
| **Planned maintenance** | 2 h | Necessary, not a waste to remove |
| **Total** | 80 h |  |

Over the week, 460 parts were made at 6 minutes per part, and 14 were declared non-conforming, so a first pass yield of 97%. Those 14 parts used about 1.4 hours of cycle time. What the numbers show:

- **Waiting is the largest waste:** 20 hours out of 80, so 25% of the week, spread over five reasons.
- **Two of the waiting reasons point to other wastes.** For the 6 hours waiting for an operator, the team explains that only one person can set up this machine: non-utilized talent. The 4 hours waiting for first-article approval raise the question of how inspection is done.
- **The 4 hours of setup above standard** do not say why. Watching the next setup will tell whether the time goes into searching, walking or a missing standard.
- **Some wastes do not appear at all.** The table says nothing about how far the parts travel or how long they wait before and after this machine.

The first actions are clear: train a second person on this machine, make sure material and programs are ready before the job starts, and review how first articles are approved. Small, fast experiments work well here. See [5 kaizen experiments to cut setup and cycle time](https://www.jitbase.com/blog/5-kaizen-experiments-cut-setup-cycle-time). If this machine is the bottleneck of the shop, each of those 20 hours is lost for the whole shop. See [bottleneck analysis in CNC shops](https://www.jitbase.com/blog/bottleneck-analysis-cnc-shops).

The numbers are an illustration, not a benchmark. The order of the reasons will be different in your shop, and that is exactly what the data is there to show.

## What Machine Data Shows, and What It Does Not

Machine data and operator entries cover part of the 8 wastes well:

- **Waiting:** machine status gives the stop time, and the reason entered by the operator says why.
- **Defects:** non-conforming parts declared with a reason, by machine and by job.
- **Setups and cycles:** actual times compared with the standard, which points to motion or extra-processing.
- **Overproduction:** part counts compared with the order quantity.

Other wastes are only visible on the floor. Transportation, motion, inventory between machines and most of non-utilized talent need someone to walk the shop, watch a setup and talk with operators. The two approaches work together: the data tells you where to look, and the floor tells you why.

## How to Start: A Waste Walk and a Pareto of Waiting

A simple start in five steps:

1. **Pick one machine or one product family.** Starting everywhere at once spreads the effort too thin.
2. **Look at one or two weeks of data.** Add up stop time by reason and non-conforming parts by reason. Keep the top three.
3. **Walk the path of one job,** from raw material to shipping, with the 8 wastes as a guide. Note every move, every wait and every search.
4. **Ask the operators.** They know which jobs cause trouble and why. This is also the first step against the 8th waste.
5. **Choose one or two actions, then measure again.** The same data that showed the waste shows whether it went down.

Keep the stop reason list short and clear, so operators can choose quickly and the data stays reliable.

## Tracking Waste With JITbase

JITbase connects to CNC machines and gives operators a screen at the machine. For the 8 wastes, it provides:

- **Stop reasons set up for your shop:** the list the operator chooses from is configured per shop, for example waiting for material, for a program or for an inspection. Waiting time can then be added up by reason, by machine and by job.
- **Non-conforming parts with a reason:** the operator declares them at the machine and picks a reason, and they are tracked by machine and by job.
- **Actual setup and cycle times by job:** you compare them with the standards and find the setups that run long.
- **Operator skills by machine, with levels:** you see which machines depend on a single person, and skills are taken into account in the schedule.

JITbase does not walk the floor for you. Transportation, motion and inventory between machines are still seen on the floor. What changes is that you arrive with the week’s numbers, and you know which machine and which reason to look at first.

**Give operators a screen at their station.** Operators enter stop reasons and non-conforming parts at the machine, and supervisors see them in real time.

[See the operator interface](https://www.jitbase.com/track-manufacturing-operations)

## Key Takeaways

- The 8 wastes of lean are defects, overproduction, waiting, non-utilized talent, transportation, inventory, motion and extra-processing: DOWNTIME.
- The 7 wastes come from the Toyota Production System. The 8th, non-utilized talent, was added later.
- In a CNC shop, waiting is usually the easiest waste to measure, as long as every stop has a reason.
- Machine data shows waiting, defects and long setups. Transportation, motion and inventory are seen on the floor.
- Start small: one machine, the top three stop reasons, a walk along the path of one job, and a talk with the operators.

**Put a number on your waiting time.** Estimate what recovered machine hours, fewer scrapped parts and shorter setups are worth in your own shop.

[Calculate your return on investment](https://www.jitbase.com/return-on-investment)

## Frequently Asked Questions

### What are the 8 wastes of lean?

The 8 wastes of lean are defects, overproduction, waiting, non-utilized talent, transportation, inventory, motion and extra-processing. Their first letters spell DOWNTIME, which makes the list easy to remember. Each one is an activity that uses time, people, machines or material without adding value that the customer is ready to pay for.

In a CNC shop, the most visible are waiting (a machine stopped for material, a program or an inspection), defects (scrapped or reworked parts) and motion (searching for tools and fixtures during a setup). The others are just as real but harder to see: parts made ahead of the order, piles of work in process between operations, or a skilled machinist who spends the shift loading parts.

### What is the 8th waste in lean?

The 8th waste is non-utilized talent: the skills, knowledge and ideas of people that the organization does not use. It was not part of the 7 wastes defined in the Toyota Production System. It was added later, when lean spread outside Toyota, to recognize that ignoring what operators know is a waste like any other.

In a CNC shop, it shows up when only one person can set up a key machine, when an experienced machinist spends the shift loading parts, or when operators know why a job always runs late but nobody asks them. The first steps are simple: build a skills matrix to see who can do what, train a second person on critical setups, and ask the operator about every recurring stop.

### What is the difference between the 7 wastes and the 8 wastes of lean?

The 7 wastes are the original list from the Toyota Production System: transportation, inventory, motion, waiting, overproduction, over-processing and defects, often remembered as TIMWOOD. The 8 wastes add non-utilized talent, and the list becomes DOWNTIME. Over-processing is usually renamed extra-processing, but it means the same thing.

There is no conflict between the two lists. The 7 wastes describe losses in the flow of work and material. The 8th adds the people side. Many shops today use the 8 wastes, because the people who run the machines are often the best source of ideas to remove the other seven.

### What is the difference between muda, mura and muri?

Muda is waste: any activity that uses resources without adding value for the customer, such as waiting or scrap. Mura is unevenness: a load that changes a lot from one day or one week to the next. Muri is overburden: asking too much of a person or a machine, such as an operator running too many machines or a spindle pushed past its limits.

The three are linked. Uneven load (mura) creates peaks where people and machines are overloaded (muri), and those peaks create waste (muda): rushed setups, scrap, overtime, then machines waiting in the valleys. Removing muda alone often fails if the load stays uneven. That is why lean pairs waste reduction with production leveling, also called heijunka.

### Which of the 8 wastes is the worst?

Overproduction is usually called the worst waste. Making parts before they are needed, or more than needed, uses machine hours, material and operator time that were needed for other jobs. It also creates other wastes: inventory to store, parts to move and count, and defects that are found late, when a whole batch is already made.

In a CNC shop, overproduction often comes from a good intention: running extra parts because the setup is already done. That can make sense for a repeat part with steady demand, but it should be a decision based on the setup cost and the real demand, not a habit. Lot sizing helps make that decision on numbers rather than on feeling.

### How do you identify waste in a CNC machine shop?

Start with the data you already have. Machine status shows when each machine is in cycle, in setup or stopped. Stop reasons entered by operators show why it stopped: waiting for material, a program, an operator or an inspection. Non-conforming parts declared with a reason show the defects by machine and by job. A Pareto chart of stop time by reason points to the biggest waiting losses.

Then go to the floor, because some wastes never appear in machine data. Transportation, motion and inventory are seen by walking the path of a job, from the saw to shipping, and by watching a setup from start to finish. A short waste walk with the 8 wastes as a guide, followed by a talk with the operators, completes what the machine data shows.

## Related reading

[![Production supervisor and CNC machinist with a tablet reviewing the weekly machine load on a shop floor screen: heijunka with JITbase](https://www.jitbase.com/hubfs/heijunka-production-leveling-cnc-shop.webp)](https://www.jitbase.com/blog/heijunka-production-leveling-cnc-shop)

### [Heijunka in CNC Shops: Production Leveling and Heijunka Box](https://www.jitbase.com/blog/heijunka-production-leveling-cnc-shop)

Heijunka is the lean practice of leveling production. It spreads the volume and the mix of work evenly over the days of a week, instead of …

[![Production manager and planner comparing machine load with capacity on a shop floor touchscreen: capacity requirements planning with JITbase](https://www.jitbase.com/hubfs/capacity-requirements-planning-cnc-shop.webp)](https://www.jitbase.com/blog/capacity-requirements-planning-cnc-shop)

### [Capacity Requirements Planning in CNC Shops: Load vs Capacity](https://www.jitbase.com/blog/capacity-requirements-planning-cnc-shop)

Capacity requirements planning (CRP), also written capacity requirement planning, compares the hours of work your jobs will ask for with …

[![Supervisor and CNC machinist reviewing a production Gantt chart on a laptop next to a CNC lathe: production Gantt chart with JITbase](https://www.jitbase.com/hubfs/production-gantt-chart-cnc-shop%20(1).webp)](https://www.jitbase.com/blog/production-gantt-chart-cnc-shop)

### [Production Gantt Chart: Definition and CNC Shop Example](https://www.jitbase.com/blog/production-gantt-chart-cnc-shop)

A production Gantt chart shows the work planned on each machine as bars on a timeline: one row per machine or per operator, one bar per …

[All articles →](https://www.jitbase.com/blog) · [RSS](https://www.jitbase.com/blog/rss.xml)

[![JITbase](https://www.jitbase.com/hubfs/Logos/jitbase-logo-black-horiz.webp)](https://www.jitbase.com/)

Production planning and machine monitoring for manufacturers. CNC machine connectivity for software providers.

**Products & Platform** [Production Planning](https://www.jitbase.com/production-planning) [Machine Monitoring](https://www.jitbase.com/machine-monitoring) [Edge Platform](https://www.jitbase.com/edge-platform)

**Explore** [Pricing](https://www.jitbase.com/pricing) [Resources & Downloads](https://www.jitbase.com/download) [Blog](https://www.jitbase.com/blog) [Book a demo](https://www.jitbase.com/demo) [About Us](https://www.jitbase.com/about-us)

© 2026 JITbase. All rights reserved.

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Judicael Deguenon",
    "url" : "https://www.jitbase.com/blog/author/judicael-deguenon"
  },
  "dateModified" : "2026-11-27T18:49:03.110Z",
  "datePublished" : "2026-11-27T18:49:03.000Z",
  "headline" : "The 8 Wastes of Lean in a CNC Shop, With Examples",
  "image" : [ "https://www.jitbase.com/hubfs/8-wastes-of-lean-cnc-shop.webp" ],
  "mainEntityOfPage" : {
    "@id" : "https://www.jitbase.com/blog/8-wastes-of-lean-cnc-shop",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://www.jitbase.com/hubfs/logo%20jitbase%201.svg"
    },
    "name" : "JITbase"
  }
}
```

```json
{
  "@context" : "https://schema.org",
  "@type" : "FAQPage",
  "mainEntity" : [ {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "The 8 wastes of lean are defects, overproduction, waiting, non-utilized talent, transportation, inventory, motion and extra-processing. Their first letters spell DOWNTIME, which makes the list easy to remember. Each one is an activity that uses time, people, machines or material without adding value that the customer is ready to pay for. In a CNC shop, the most visible are waiting (a machine stopped for material, a program or an inspection), defects (scrapped or reworked parts) and motion (searching for tools and fixtures during a setup). The others are just as real but harder to see: parts made ahead of the order, piles of work in process between operations, or a skilled machinist who spends the shift loading parts."
    },
    "name" : "What are the 8 wastes of lean?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "The 8th waste is non-utilized talent: the skills, knowledge and ideas of people that the organization does not use. It was not part of the 7 wastes defined in the Toyota Production System. It was added later, when lean spread outside Toyota, to recognize that ignoring what operators know is a waste like any other. In a CNC shop, it shows up when only one person can set up a key machine, when an experienced machinist spends the shift loading parts, or when operators know why a job always runs late but nobody asks them. The first steps are simple: build a skills matrix to see who can do what, train a second person on critical setups, and ask the operator about every recurring stop."
    },
    "name" : "What is the 8th waste in lean?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "The 7 wastes are the original list from the Toyota Production System: transportation, inventory, motion, waiting, overproduction, over-processing and defects, often remembered as TIMWOOD. The 8 wastes add non-utilized talent, and the list becomes DOWNTIME. Over-processing is usually renamed extra-processing, but it means the same thing. There is no conflict between the two lists. The 7 wastes describe losses in the flow of work and material. The 8th adds the people side. Many shops today use the 8 wastes, because the people who run the machines are often the best source of ideas to remove the other seven."
    },
    "name" : "What is the difference between the 7 wastes and the 8 wastes of lean?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "Muda is waste: any activity that uses resources without adding value for the customer, such as waiting or scrap. Mura is unevenness: a load that changes a lot from one day or one week to the next. Muri is overburden: asking too much of a person or a machine, such as an operator running too many machines or a spindle pushed past its limits. The three are linked. Uneven load (mura) creates peaks where people and machines are overloaded (muri), and those peaks create waste (muda): rushed setups, scrap, overtime, then machines waiting in the valleys. Removing muda alone often fails if the load stays uneven. That is why lean pairs waste reduction with production leveling, also called heijunka."
    },
    "name" : "What is the difference between muda, mura and muri?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "Overproduction is usually called the worst waste. Making parts before they are needed, or more than needed, uses machine hours, material and operator time that were needed for other jobs. It also creates other wastes: inventory to store, parts to move and count, and defects that are found late, when a whole batch is already made. In a CNC shop, overproduction often comes from a good intention: running extra parts because the setup is already done. That can make sense for a repeat part with steady demand, but it should be a decision based on the setup cost and the real demand, not a habit. Lot sizing helps make that decision on numbers rather than on feeling."
    },
    "name" : "Which of the 8 wastes is the worst?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "Start with the data you already have. Machine status shows when each machine is in cycle, in setup or stopped. Stop reasons entered by operators show why it stopped: waiting for material, a program, an operator or an inspection. Non-conforming parts declared with a reason show the defects by machine and by job. A Pareto chart of stop time by reason points to the biggest waiting losses. Then go to the floor, because some wastes never appear in machine data. Transportation, motion and inventory are seen by walking the path of a job, from the saw to shipping, and by watching a setup from start to finish. A short waste walk with the 8 wastes as a guide, followed by a talk with the operators, completes what the machine data shows."
    },
    "name" : "How do you identify waste in a CNC machine shop?"
  } ]
}
```