---
title: Quality Management System Examples for CNC Machine Shops
description: "Quality management system examples for CNC machine shops: processes to document, records to keep and how production data supports your audits."
image: https://www.jitbase.com/hubfs/quality-management-system-examples-cnc-machine-shops-hero.webp
---

[+1 438 942-8501](tel:+1%20438%20942-8501)

[Log In](https://app.jitbase.com/)

- [English](https://www.jitbase.com/blog/quality-management-system-examples-cnc-machine-shops)
- [Français](https://www.jitbase.com/fr/blog/systeme-management-qualite-atelier-cnc)

[![JITbase black logo](https://www.jitbase.com/hs-fs/hubfs/Logos/jitbase-logo-black-horiz.webp?width=175&height=88&name=jitbase-logo-black-horiz.webp)](https://www.jitbase.com)

- Solutions

   Back

  ##### [Machine Monitoring](https://www.jitbase.com/machine-monitoring)

    - ##### [Machine Monitoring](https://www.jitbase.com/machine-monitoring)
  
  Back
  
    - [Live Dashboard](https://www.jitbase.com/machine-monitoring)
    - [Track OEE](https://www.jitbase.com/machine-monitoring#Track-OEE)
    - [Track Downtime Reasons](https://jitbase.com/machine-monitoring#Track-Downtime-Reasons)
    - [Reporting](https://jitbase.com/machine-monitoring#Reporting)
    - [Timelines](https://jitbase.com/machine-monitoring#Timelines)
  
  ##### [Production Monitoring](https://www.jitbase.com/production-monitoring)

    - ##### [Production Monitoring](https://www.jitbase.com/production-monitoring)
  
  Back
  
    - [Accurate Standard Times](https://jitbase.com/program-monitoring#Accurate-Standard-Times)
    - [Tool path & M00 tracking](https://jitbase.com/program-monitoring#Tool-path-M00-tracking)
    - [Performance tracking](https://jitbase.com/program-monitoring#Performance)
    - [CNC Program Improvement](https://jitbase.com/program-monitoring#CNC-Program-Improvement)
    - [Overtime Reasons](https://jitbase.com/program-monitoring#Overtime-Reasons)
    - [Lights-out Operations](https://jitbase.com/program-monitoring#Light-Out-Ope)
  
  ##### [Scheduling & Workforce Management](https://www.jitbase.com/workforce-management)

    - ##### [Scheduling & Workforce Management](https://www.jitbase.com/workforce-management)
  
  Back
  
    - [Operator Workload](https://jitbase.com/workforce-management#Operator-Workload)
    - [Workforce Scheduling](https://jitbase.com/workforce-management/#Operator-Daily-Allocation)
    - [Live Job Tracking](https://jitbase.com/workforce-management#Live-Job-Tracking)
    - [Production Planning and Scheduling](https://jitbase.com/workforce-management#Job-Operation-Planning)
    - [Live guidance for Operators](https://jitbase.com/workforce-management#Live-guidance-for-Operators)
  
  ##### [Edge Platform](https://www.jitbase.com/edge-platform)

    - ##### [Edge Platform](https://www.jitbase.com/edge-platform)
  
  Back
  
    - [Manage your own infrastructure](https://www.jitbase.com/edge-platform#Manage-your-own-infrastructure)
    - [Send Machine data to local server](https://www.jitbase.com/edge-platform#Machine-data-to-local-server)
    - [Drivers for standard protocols](https://www.jitbase.com/edge-platform#Drivers-for-standard-protocols)
    - [Integrations](https://www.jitbase.com/edge-platform#Integrations)
- Resources

   Back

  ##### [Our Downloadable Resources](https://www.jitbase.com/download)

    - ##### [Our Downloadable Resources](https://www.jitbase.com/download)
  
  Back
  
    - [Case Studies](https://jitbase.com/download#case-studies)
    - [White Papers](https://jitbase.com/download#white-papers)
    - [Brochures](https://jitbase.com/download#brochures)
    - [Product & Integration](https://jitbase.com/download#Product-Integration)
    - [In the Media](https://jitbase.com/download#in-the-media)
  
  ##### [Education](https://www.jitbase.com/education)

    - ##### [Education](https://www.jitbase.com/education)
  
  Back
  
    - [Workforce Management vs. Machine Monitoring](https://jitbase.com/education#Workforce-Management-vs-Machine-Monitoring)
    - [How to start?](https://jitbase.com/education#How-to-start)
    - [Infrastructure & Cyber-Security](https://jitbase.com/education#Infrastructure-Cyber-Security)
    - [Why the Cloud?](https://jitbase.com/education#Why-the-Cloud)
    - [FAQ](https://jitbase.com/education#Education-FAQ)
  
  ##### [Forms](https://www.jitbase.com/demo)

    - ##### [Forms](https://www.jitbase.com/demo)
  
  Back
  
    - [Return on Investissement](https://www.jitbase.com/return-on-investment)
    - [Machines we connect](https://www.jitbase.com/machines-we-connect)
    - [Demo Request](https://www.jitbase.com/demo)
  
  ##### [Blog](https://www.jitbase.com/blog)

    - ##### [Blog](https://www.jitbase.com/blog)
  
  Back
  
    - [Machine Monitoring](https://www.jitbase.com/blog/tag/machine-monitoring)
    - [Labor Management](https://www.jitbase.com/blog/tag/labor-management)
    - [Production Planning and Scheduling](https://www.jitbase.com/blog/tag/production-planning-and-scheduling)
    - [Quality and Inspection](https://www.jitbase.com/blog/tag/quality-and-inspection)
- [Plans](https://www.jitbase.com/plans)
- Why JITbase

   Back

    - ##### [Why JITbase](https://www.jitbase.com/why-jitbase)
    - ##### [About Us](https://www.jitbase.com/about-us)
    - ##### [Partners](https://www.jitbase.com/partners)

[Connect Machines for Free](https://sso.jitbase.com/realms/webapp/protocol/openid-connect/registrations?client_id=website-registration&response_type=code&scope=openid&redirect_uri=https://admin.jitbase.com)

[+1 438 942-8501](tel:+1%20438%20942-8501) [Log In](https://app.jitbase.com/)

- [English](https://www.jitbase.com/blog/quality-management-system-examples-cnc-machine-shops)
- [Français](https://www.jitbase.com/fr/blog/systeme-management-qualite-atelier-cnc)

  

[Book a demo](https://www.jitbase.com/demo) [Connect Machines for Free](https://sso.jitbase.com/realms/webapp/protocol/openid-connect/registrations?client_id=website-registration&response_type=code&scope=openid&redirect_uri=https://admin.jitbase.com)

![CNC machinist checking a part with a caliper next to a machine: quality management system examples with JITbase](https://www.jitbase.com/hubfs/quality-management-system-examples-cnc-machine-shops-hero.webp)

 Blog [Quality and inspection](https://www.jitbase.com/blog/tag/quality-and-inspection)

# Quality Management System Examples for CNC Machine Shops

[*written by* Judicael Deguenon on October 26, 2026](https://www.jitbase.com/blog/author/judicael-deguenon)

In contract machining, quality is more than measuring parts. A customer who audits your shop wants to see how you control your processes, how you handle a deviation, and above all what proves it. Many small shops answer with binders, paper forms and the memory of a few people, which works until the day a customer asks for the history of one lot.

A **quality management system** (QMS) gives all of this a structure: clear processes, responsibilities, reliable records and continuous improvement. This guide gives **quality management system examples** for a CNC machine shop: which processes to document, which records to keep, which indicators to track, and how **production data** can supply the evidence an auditor expects. ISO 9001 has just been revised (the 2026 edition came out on September 16, 2026), and we will say a word about it without making it the center of the topic.

**TL;DR:**

- A QMS is not a binder: it is how the shop controls its processes, handles deviations and keeps the proof.
- Start small with **3 to 5 processes** that touch the part, a few simple indicators and one pilot cell.
- Production data (machine states, stops, operator confirmations) is the best source of evidence, as long as it is reliable and dated.

## What is a quality management system in a machine shop?

### Definition: what a QMS organizes

A quality management system brings together the company's quality policy, the processes that make and inspect parts, each person's responsibilities, the documentation rules, and the records that prove everything is applied. It also covers how the shop learns from mistakes: nonconformance handling, corrective actions and management review.

In a CNC shop, it covers the whole path of the part: review of the customer's request, setup, machining, inspection, shipping and follow-up after delivery.

### QMS and ISO 9001: how they relate

ISO 9001 is the international standard that sets the requirements for a QMS. It is voluntary, but many customers ask suppliers for it, and sector standards such as AS9100 (aerospace), ISO 13485 (medical devices) and IATF 16949 (automotive) are aligned with it and add their own requirements. The 2026 revision is described as an evolution rather than a revolution: the process approach stays central, with more weight on quality culture, on managing risks and opportunities separately, and on managing changes to the system.

### Why contract CNC shops adopt one

Three reasons come up most often: customer requirements, because customers want proof and not only good parts; the cost of poor quality, with scrap, rework and returns; and dependence on a few people, when know-how is written nowhere. A simple QMS that is actually applied answers all three.

Keep the proof of what happened on every machine

Machine states, stops and real cycle times are recorded automatically, giving you dated, reliable data to answer an audit or a customer question.

[Explore machine monitoring](https://www.jitbase.com/machine-monitoring)

## Quality management system examples: which processes to document?

### Example process map: from customer request to shipping

You do not need to describe the whole company. Start from the path of an order and describe, for each step, what must be controlled and what will be kept as evidence.

| Step | What must be controlled | Typical record |
| --- | --- | --- |
| Order review | Drawings, tolerances, quantities, lead time, special requirements | Signed quote and order review |
| Material and purchasing | Conformity of material and outside suppliers | Material certificates, supplier evaluation |
| Setup and release | Routing, CNC program, tooling, current revision | Approved routing, program revision |
| First article | Approval of the first part before the run | First article inspection report |
| In-process inspection | Drift, tool wear, critical characteristics | Measurement logs, control charts |
| Final inspection and release | Conformity of the part before shipping | Final report, release decision |
| Nonconformances | Nonconforming part isolated, decision made | Nonconformance report and decision |
| Corrective actions | Cause found, action decided, effectiveness checked | Closed corrective action record |
| Measuring equipment and skills | Calibration, training and authorization | Calibration log, skills matrix |

For the setup steps, see our article on [manufacturing routing in a CNC shop](https://www.jitbase.com/blog/manufacturing-routing-cnc-shop); for the first part, [first article inspection](https://www.jitbase.com/blog/first-article-inspection-cnc-shops); for checks during machining, [automated in-process inspection with probing and SPC](https://www.jitbase.com/blog/automated-in-process-inspection-milling-probe-spc).

### An example: the trail of one work order

Here is what a complete trail can look like for a single work order, as a simple illustration:

1. The order review is signed and the drawing revision is recorded.
2. The routing and the CNC program revision are released to the machine.
3. The first article is measured and approved before the run starts.
4. During the run, in-process checks are logged and the machine states are recorded.
5. A deviation is found: the part is isolated, a decision is made, and a nonconformance report is opened.
6. A corrective action is defined, carried out and checked for effectiveness.
7. Final inspection results and the release decision are saved with the shipment.

If every step leaves a dated record, an auditor can follow the trail from end to end without asking anyone to reconstruct it from memory.

### An example of a nonconformance record

A nonconformance record does not need to be long. These fields are usually enough to keep it useful:

| Field | Example of content |
| --- | --- |
| Identification | Work order, part number and revision, quantity affected |
| Where and when | Machine, operator, shift, date and time of detection |
| Description | Characteristic out of tolerance, measured value against the drawing |
| Containment | Parts isolated and tagged, rest of the lot checked |
| Decision | Scrap, rework, use as is or return, with the name of who decided |
| Cause and action | Root cause found, corrective action and owner |
| Closure | Date, effectiveness check and link to the work order |

Machine, shift and timing fields are the ones most often missing on paper forms. Data captured at the machine fills them in for you.

### Write less, write right

A document nobody reads protects nothing. Write what the operator actually uses, where it is used, and remove old versions. The standard mainly asks that information be current, available and controlled, not that there be a lot of it.

## Which records will an auditor or customer ask for?

During an audit, the question is rarely whether you have a procedure. It is usually, show me how this happened for this order. The records most often requested are:

- the history of a work order: machine, dates, program and revision used;
- inspection results (first article, in-process, final);
- nonconformances, the decision taken and the related corrective action;
- traceability of quantities produced, accepted and scrapped (see [how to automate part counting](https://www.jitbase.com/blog/part-counting-cnc-shops));
- calibration of measuring equipment and operator training.

The problem with paper forms is that they are often filled in after the fact, sometimes copied, and it takes hours to rebuild a file. A reliable record is made when the event happens.

## Which quality indicators should you track?

Four to six indicators are enough, as long as they are calculated from real data:

- **Scrap rate:** scrapped parts compared with parts started (see [reducing scrap rate in CNC machining](https://www.jitbase.com/blog/reducing-scrap-rate-cnc-machining)).
- **First pass yield:** parts that are good the first time, without rework.
- **Nonconformance rate** by part family or by customer.
- **Customer complaints** and the time taken to resolve them.
- **Time to close corrective actions.**
- **OEE,** whose quality component links production to overall performance (see our [OEE guide](https://www.jitbase.com/blog/understanding-oee-ooe-and-teep-key-metrics-in-manufacturing)).

An indicator is only worth tracking if it triggers an action. For each one, decide who looks at it, how often, and what happens when the value drifts.

Follow every work order from release to completion

Operators confirm tasks and enter stop reasons at the machine, which gives you dated, reliable records without paper forms.

[Explore production monitoring](https://www.jitbase.com/production-monitoring)

## How production data feeds the QMS

### What the machine provides

Machine states (cutting, idle, alarm), real cycle times, stops and counts are recorded automatically, with date and time. These are facts, not declarations: they let you rebuild what happened on a work order and spot drift before it produces scrap.

### What the operator provides

The machine tells you what happened, and the operator tells you why. With JITbase, for example, the operator confirms tasks and enters stop reasons on the screen at the machine, while machine states and cycle times are captured automatically. These confirmations become dated records attached to the work order, which you can find without digging through paper files. As auditors are expected to look more closely at digitalization and data integrity, records that are captured at the source and cannot be rewritten after the fact are an advantage. For the rollout side, see [shop floor change management and operator buy-in](https://www.jitbase.com/blog/shop-floor-change-management-operator-buy-in).

### What this data does not replace

Production data supplies the raw material of records, but it is not the QMS. Processes, responsibilities, release decisions, nonconformance handling and management review remain the company's job. The tracking tool feeds the system, it does not replace it.

To connect this data with planning and work orders, read our guide on [paperless manufacturing with MES, ERP and work order systems](https://www.jitbase.com/blog/guide-production-management-mes-erp-paperless-manufacturing). To make use of stops, read [downtime root cause analysis with Pareto charts](https://www.jitbase.com/blog/downtime-root-cause-analysis-pareto-charts); to keep information flowing between shifts, [shift handover best practices](https://www.jitbase.com/blog/shift-handover-best-practices-cnc-shops).

## Where to start: a five-step plan

1. **Map** three to five processes that touch the part, as they work today.
2. **Choose** four to six indicators and check that data exists to calculate them.
3. **Test** on one cell or one family of repeat parts, capturing data at the source.
4. **Run a mock internal audit:** ask someone from outside the workstation to find the history of a recent order.
5. **Hold a management review:** decide actions, resources and priorities from the indicators.

Measure your starting point before you change anything. Without a comparison, you cannot show the improvement to management or to an auditor.

## Which pitfalls should you avoid?

- **Writing documentation nobody uses:** start from the workstation, not from the standard.
- **Filling in records after the fact:** evidence loses its value if it is reconstructed.
- **Multiplying indicators:** an indicator with no owner and no action is noise.
- **Treating quality as one person's job:** management and operators must both take part.
- **Not checking that a corrective action worked:** closing the form does not fix the cause.

## The Bottom Line

An effective quality management system in a CNC shop stays simple: a few processes described close to the workstation, indicators that trigger actions, and records made when events happen. Production data does not replace the system, but it gives it something to prove.

Start with one cell, measure the starting point, then extend. To go further on inspection, see also our article on [machine tool inspection software](https://www.jitbase.com/blog/machine-tool-inspection-software-cnc-shops) and the [guide to CMM inspection](https://www.jitbase.com/blog/ultimate-guide-cnc-machining-cmm-inspection).

Estimate the payback of better quality records

Enter your machines, shifts and the time spent rebuilding job files to see what reliable data could return in your shop.

[Calculate your return on investment](https://www.jitbase.com/return-on-investment)

## Frequently Asked Questions

### Is a quality management system mandatory for a machine shop?

ISO 9001 is a voluntary standard, so no shop is required to be certified in order to operate. In practice, many customers require it, or ask for it, before they approve a supplier, and some sectors such as aerospace, medical and automotive use standards built on the same foundation.

Even without certification, a structured quality management system helps you cut scrap, close nonconformances faster and pass customer audits with less stress. Check what your customers actually require before you decide whether to certify.

### What is the difference between a QMS and ISO 9001 certification?

A quality management system (QMS) is the set of processes, responsibilities, rules and records you use to control quality. You can build and run one without ever being audited by an outside body.

ISO 9001 certification is an independent confirmation that your QMS meets the requirements of the standard and is actually applied. The QMS is the working tool, and the certificate is the proof you show to third parties.

### Where should a shop with no formal system start?

Start by mapping the three to five processes that touch the customer's part: order review, setup and release, inspection, nonconformance handling and shipping. Describe what you already do in a few lines instead of inventing a theoretical organization.

Then pick a few simple indicators, such as scrap rate and first pass yield, and check that you can calculate them from real data. Test the whole thing on one cell before extending it to the shop.

### Which documents does a CNC shop really need?

Focus on documents operators use: current work instructions, routings, approved drawings and programs, and inspection criteria. What matters to the standard is that information is current, available at the workstation, and that old versions no longer circulate.

For records, keep what proves that inspections took place and that deviations were handled: measurement results, nonconformances and decisions, calibration of measuring equipment, and operator training. The fewer documents you have, the better they are maintained.

### How does production data help during an audit?

An auditor or customer wants evidence: which work order was produced, on which machine, when, with which program, and what happened when there was a stop or a deviation. Data captured automatically or confirmed by the operator at the machine is dated and hard to dispute, unlike forms filled in after the fact.

It also lets you answer quickly, because finding the history of a lot no longer means digging through paper files. This data does not replace the QMS, but it feeds its records.

### Does the new edition of ISO 9001 change anything for a machine shop?

ISO 9001:2026 was published on September 16, 2026. The process approach remains at the core, and the new edition puts more emphasis on quality culture, on identifying risks and opportunities separately, and on planning and reviewing changes to the QMS. For a shop, the basic processes should not change much, but management must be able to show its role in quality.

A three-year transition period has been announced for organizations certified to the 2015 edition, and some certification bodies already publish an end date. Deadlines and audit rules come from your certification body, so confirm them with it before you plan your next audit.

#### SHARE

[mailto:email@example.com?subject=Mail%20from%20our%20Website](mailto:email@example.com?subject=Mail%20from%20our%20Website)

[![JITbase block logo](https://www.jitbase.com/hs-fs/hubfs/eca01011d7169e8c6395a8d7eebe802d.webp?width=317&height=158&name=eca01011d7169e8c6395a8d7eebe802d.webp)](https://www.jitbase.com)

![image-2](https://www.jitbase.com/hs-fs/hubfs/image-2.webp?width=156&height=78&name=image-2.webp)

Solutions

- [Machine Monitoring](https://www.jitbase.com/machine-monitoring)
- [Production Monitoring](https://www.jitbase.com/production-monitoring)
- [Scheduling & Workforce Management](https://www.jitbase.com/workforce-management)
- [Edge Platform](https://www.jitbase.com/edge-platform)
- [Plans](https://www.jitbase.com/plans)

<https://linkedin.com/company/jitbase> <https://www.facebook.com/jitbase> <https://www.youtube.com/channel/UC0hNdL3yfYCXDpsvQ65Onzg>

Resources

- [Download](https://www.jitbase.com/download)
- [Education](https://www.jitbase.com/education)
- [Return on Investment](https://www.jitbase.com/return-on-investment)
- [CNC Machines we connect](https://www.jitbase.com/machines-we-connect)
- [Demo Request](https://www.jitbase.com/demo)

Why JITbase

- [Why JITbase](https://www.jitbase.com/why-jitbase)
- [About Us](https://www.jitbase.com/about-us)
- [Partners](https://www.jitbase.com/partners)
- [Contact Us](https://www.jitbase.com/contact)

[Book a demo](https://www.jitbase.com/demo) [Connect Machines for Free](https://sso.jitbase.com/realms/webapp-ngen/protocol/openid-connect/registrations?client_id=website-frontend&response_type=code&scope=openid%20email&redirect_uri=https://admin.jitbase.com/next-gen)

<https://linkedin.com/company/jitbase> <https://www.facebook.com/jitbase> <https://www.youtube.com/channel/UC0hNdL3yfYCXDpsvQ65Onzg>

© 2026 All rights reserved.

- [Privacy Policy](https://www.jitbase.com/privacy-policy)

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Judicael Deguenon",
    "url" : "https://www.jitbase.com/blog/author/judicael-deguenon"
  },
  "dateModified" : "2026-10-26T17:15:19.510Z",
  "datePublished" : "2026-10-26T17:15:19.000Z",
  "headline" : "Quality Management System Examples for CNC Machine Shops",
  "image" : [ "https://www.jitbase.com/hubfs/quality-management-system-examples-cnc-machine-shops-hero.webp" ],
  "mainEntityOfPage" : {
    "@id" : "https://www.jitbase.com/blog/quality-management-system-examples-cnc-machine-shops",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://www.jitbase.com/hubfs/logo%20jitbase%201.svg"
    },
    "name" : "JITbase"
  }
}
```

```json
{
  "@context" : "https://schema.org",
  "@type" : "FAQPage",
  "mainEntity" : [ {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "<p>ISO 9001 is a voluntary standard, so no shop is required to be certified in order to operate. In practice, many customers require it, or ask for it, before they approve a supplier, and some sectors such as aerospace, medical and automotive use standards built on the same foundation.</p><p>Even without certification, a structured quality management system helps you cut scrap, close nonconformances faster and pass customer audits with less stress. Check what your customers actually require before you decide whether to certify.</p>"
    },
    "name" : "Is a quality management system mandatory for a machine shop?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "<p>A quality management system (QMS) is the set of processes, responsibilities, rules and records you use to control quality. You can build and run one without ever being audited by an outside body.</p><p>ISO 9001 certification is an independent confirmation that your QMS meets the requirements of the standard and is actually applied. The QMS is the working tool, and the certificate is the proof you show to third parties.</p>"
    },
    "name" : "What is the difference between a QMS and ISO 9001 certification?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "<p>Start by mapping the three to five processes that touch the customer's part: order review, setup and release, inspection, nonconformance handling and shipping. Describe what you already do in a few lines instead of inventing a theoretical organization.</p><p>Then pick a few simple indicators, such as scrap rate and first pass yield, and check that you can calculate them from real data. Test the whole thing on one cell before extending it to the shop.</p>"
    },
    "name" : "Where should a shop with no formal system start?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "<p>Focus on documents operators use: current work instructions, routings, approved drawings and programs, and inspection criteria. What matters to the standard is that information is current, available at the workstation, and that old versions no longer circulate.</p><p>For records, keep what proves that inspections took place and that deviations were handled: measurement results, nonconformances and decisions, calibration of measuring equipment, and operator training. The fewer documents you have, the better they are maintained.</p>"
    },
    "name" : "Which documents does a CNC shop really need?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "<p>An auditor or customer wants evidence: which work order was produced, on which machine, when, with which program, and what happened when there was a stop or a deviation. Data captured automatically or confirmed by the operator at the machine is dated and hard to dispute, unlike forms filled in after the fact.</p><p>It also lets you answer quickly, because finding the history of a lot no longer means digging through paper files. This data does not replace the QMS, but it feeds its records.</p>"
    },
    "name" : "How does production data help during an audit?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "<p>ISO 9001:2026 was published on September 16, 2026. The process approach remains at the core, and the new edition puts more emphasis on quality culture, on identifying risks and opportunities separately, and on planning and reviewing changes to the QMS. For a shop, the basic processes should not change much, but management must be able to show its role in quality.</p><p>A three-year transition period has been announced for organizations certified to the 2015 edition, and some certification bodies already publish an end date. Deadlines and audit rules come from your certification body, so confirm them with it before you plan your next audit.</p>"
    },
    "name" : "Does the new edition of ISO 9001 change anything for a machine shop?"
  } ]
}
```